- Project Scope DESIGN & BUILD
- Location Emaar Square
- Area 4200 M2
- Year 2020
Ceva Logistics
CEVA Logistics Istanbul Headquarters is located in Emaar Square on a total area of 3600 m² over 3 floors. The project started in November 2019 and was completed and delivered in January 2020.
In line with the changing corporate structure of the company, the aim is to create a minimal and plain design language and enable the optimal use of the spaces set up as open office and closed executive rooms by a large team.
A plain design language has been implemented in the entire office from the reception area, through the use of painted glass and natural wooden coating on the walls, marble appearance on the floor and a plain ceiling. In line with the company's working system, meeting areas were designed to be located in a separate zone from office areas, and controlled access from the reception to this area was ensured. The open offices were designed with the maximum use of daylight and optimal use of space by a large team in mind, with visual monitoring ensured from the floor and ceiling, and emergency exit pathways were functionally and visually highlighted with red.